Just when you thought that installing two 150 man lifeboats would be enough, we go and put another 2 on. Last month saw the final installment of two 50 man lifeboats being loaded onto the ship. A lot of work has gone into this with many alterations to make them fit, so it was very satisfying to at last see them hanging from their davits. I just hope we never have to use them for other than training, but you never want to be without them!
No comments:
Post a Comment